Indoor 3D ToursExterior 3D & MappingRoof & Thermal InspectionCinematic & HospitalityListing MediaMilestone & SIRS CaptureInsurance & ClaimsHomeWho We ServePricingWorkInsightsAboutContact Get an estimate

Selected work

Three jobs, and what they actually changed

Client names are withheld where the engagement is under NDA or where the finding is commercially sensitive — which, on the intelligence side, is most of them.

2016

flying South Florida since

TRAILING
$2M

aviation liability carried on every flight

96%

on-time delivery against published SLA

4

capture methods on one aircraft

INS-02 · Thermal envelope survey

Two wet sections found under a resort membrane

Resort property · Collier County

The situation. A 190,000 sf built-up roof with intermittent interior staining and no visible surface defect. Two prior visual walk-throughs found nothing actionable.

What we flew. Dusk radiometric thermal across the full roof area, flown in a single 90-minute window while the deck shed daytime heat. Two anomalies isolated, sized, and correlated against the visual set.

targeted repair executed
$40K
tear-off avoided
$600K
report to owner
48 hr
ANOMALY 01 · Δ 11.4°FANOMALY 02 · Δ 8.1°FTHERMAL · IRONBOWALT 180 FT AGL · GSD 0.41 IN/PX · 26.142N 81.795W°F11872
INS-02 · THERMAL ENVELOPE SURVEYREPRESENTATIVE OUTPUT

CMP-01 · Milestone envelope capture

A 22-story envelope documented in three days, not six weeks

Coastal tower · Broward County

The situation. An association facing the HB-913 coordination deadline with a swing-stage quote that put Phase 1 documentation eight weeks out and past the board's assessment vote.

What we flew. Full envelope capture at fixed standoff across all four elevations, indexed to floor line and column grid, with unit-owner notice language provided a week ahead of the flight window.

on site, all elevations
3 days
envelope coverage
100%
to engineer of record
5 days
ORTHOMOSAIC · 2.1 CM/PX412 IMAGES · 9 LEGS · 5 GCP · RTK FIX
CMP-01 · MILESTONE ENVELOPE CAPTUREREPRESENTATIVE OUTPUT

LST-02 · Listing signature

Eleven showings the first weekend on a stalled Park Shore listing

Park Shore · Naples

The situation. A waterfront listing 46 days on market with ground photography that could not establish direct Gulf access — the single feature the price was built on.

What we flew. Day and twilight passes establishing dock, basin, bridge clearance, and beach proximity in one frame. Horizontal cut for the listing, 9:16 vertical shot native for paid social.

showings, first weekend
11
media delivered
24 hr
total media spend
$795
TWILIGHT · 18:42 EDTALT 120 FT AGL · f/2.8 · 1/40s · ISO 400
LST-02 · LISTING SIGNATUREREPRESENTATIVE OUTPUT

In their words

The work speaks in specifics

★★★★★
“The twilight set came back in under 24 hours and the listing had eleven showings that weekend. I have not booked another aerial vendor since.”
Listing AgentPark Shore, Naples · LST-02
★★★★★
“They found trapped moisture under two sections of membrane that our walk-through had missed entirely. The repair was forty thousand dollars. The tear-off we avoided was six hundred.”
Director of EngineeringResort property, Collier County · INS-02
★★★★★
“Our engineer got a complete, indexed envelope set in five days instead of the six weeks a swing stage would have taken. The board approved the assessment at the next meeting.”
Association ManagerCoastal tower, Broward County · CMP-01

Next step

Your job is the fourth one on this page.

Send the address. We will tell you what is flyable, what it costs, and when it lands.